Availability: Better Tasks is generally available; task creation follows your plan allowance.
A task does not always need a CRM record
Create a Better Task for internal work before you know which customer or deal it belongs to. An admin can now choose whether Related records is required in Configuration. New organizations start with it optional; existing configurations keep it required until an admin changes the setting.
A task without related records is still added as an Attio task, but does not appear as an Activity on a record timeline. A task already linked to records must keep at least one. The Better Tasks setup guide explains both paths.
More context on the board
Board cards show attributes on separate lines, related records, due dates, comment counts, and checklist progress. Turn on Show days overdue in Board settings or the list's Columns options when you want late work to stand out. Record names open their Attio records in a new tab.
Use Has comments and Assigned to me to narrow the work you review, or Shift-click to select a range in checkbox lists. The built-in task name is now labeled Title. Tags use a multi-value Select, keeping existing options, defaults, and saved values.
Task edits reach Attio sooner
Edits in Better Tasks are sent to Attio right away rather than waiting for the next periodic pass. Updating a due date or assignee no longer has to wait for a separate Activity setup problem to be repaired. If setup was removed in Attio, the task explains what happened and offers Retry.
The task details now name External task ID, Attio task ID, and Parent external task ID separately. Edits made directly to Activity records in Attio are not read back automatically; use the supported task fields and sync review for changes that need to stay connected.